User:Ritu Shrestha/Teaching Practice Lesson Plan-23

From ICTED-WIKI
Jump to navigation Jump to search

Class: BICTE 4th Semester                                              Date: 2024/02/18

Subject: System Analysis and Design                               Time: 50 min      

Unit: 5                                                                            Number of Students: 15

Topic: Reflection on Unit 5                

1.    Specific Objective:

At the end of this lesson, students will be able:

·       To reflect on the key concepts covered in Unit 5, User-Centered System Design and related topics.

·       To review understanding of UCSD, Human Factors (HF), Ergonomics, Situational Assessment, and Complex System Development.

·       To discuss the actions and integration of Safety Engineering (SE), HF, and Ergonomics in system design.

2.    Instructional materials:

·       Daily uses materials

·       PowerPoint presentation slides

3.    Teaching Learning Activities:

·       Welcome the students and introduce the purpose of the lesson: to reflect on the key concepts covered in Unit 5 of the course.

·       Review the importance of User-Centered System Design (UCSD) in creating systems that meet user needs and preferences.

·       Recap the concepts of Human Factors (HF) and Ergonomics and their significance in system design and usability.

·       Encourage students to reflect on the implications of these topics in real-world scenarios or projects they have encountered.

·       Explore examples of how SE, HF, and Ergonomics considerations are integrated in system design and development processes.

·       Facilitate a discussion where students can reflect on their learning from Unit 5 and share any questions, insights, or challenges they encountered.

·       Address any remaining questions or concerns.

4.    Assessment:

·       Define User-Centered System Design (UCSD) and explain its significance in system development.

·       Discuss the challenges associated with developing complex systems, and propose strategies for addressing them.

5.    Evaluation:

Propose a plan for conducting a situational assessment for a hypothetical system development project, outlining the steps to be taken and potential challenges to be addressed.